Newbuilding
Propeller design point
The light running margin and the design speed fixed against the engine's layout, so the vessel keeps its service speed through the docking interval.
Services · Propulsion shafting · Propeller and engine matching
A matching study shows where the propeller holds the engine across the vessel's operating range: whether the engine reaches its rated power at rated speed with a clean hull, how much margin is left as the hull fouls and the weather rises, and where the operating points sit on the engine's load diagram. It supports the choice of a new propeller, a repowering or derating, a change of service speed, and the investigation of an engine that runs heavy or cannot reach its power.
The propeller sets the torque the shaft transmits, the thrust the thrust bearing carries, the inertia the torsional calculation depends on and the weight the alignment hangs from the aft end. A change of propeller or of engine rating changes all of these, and a matching study that stops at the speed-power curve leaves them unchecked.
Here the match is made on the same vessel case as the shafting calculations. When a new propeller is proposed, its mass and inertia go straight into the alignment and torsional models, and the report states the effect on the barred range and the bearing loads alongside the effect on speed and fuel.
The propeller open-water calculator on this site shows the Wageningen B-series and Gawn series calculations used at the screening stage of a matching study.
Decisions it supports
Newbuilding
The light running margin and the design speed fixed against the engine's layout, so the vessel keeps its service speed through the docking interval.
Retrofit
A propeller for a lower service speed, a derated engine or a changed trade, checked for the engine, the shaft line and the class calculations it alters.
In service
An engine on its load limit or short of power, traced to fouling, propeller condition, a heavy match or a change in the hull, with the remedy quantified.
Trials
Trial measurements corrected for wind, waves, current and displacement, and the result set against the contract curve.
Deliverables
Input data
If the hull's 3D model has not survived, it can be rebuilt from the drawings and its resistance and wake calculated: see 3D hull, CFD and wake.
Questions from owners and yards
It depends on the trade, the hull coating, the docking interval and the engine type, and is typically a few per cent of speed. The study shows how far the propeller curve moves over the docking interval for this vessel, and the margin is chosen so that the engine still reaches its contract power at the end of it.
Often it pays. A propeller designed for the lower speed and the reduced power runs at a better efficiency than the original at part load. The study compares the fuel saving with the cost, and checks the new propeller's effect on the shaft line and on the torsional barred range.
The propeller is running heavy: fouling, propeller damage or roughness, added resistance in weather, or a match that left too little margin. Service data is used to separate these, and the report states which applies and what restores the margin.
Yes. The combinator curve of pitch against speed is assessed on the load diagram in the same way, and an improved combinator schedule can be proposed.
Commissioning
Send the shafting arrangement drawing and whatever machinery data is to hand. An initial technical response follows within two working days, then a written scope and proposal: the conditions to be calculated, the data still needed, the deliverables, the fee and the schedule. A non-disclosure agreement can be put in place before any drawing is exchanged. The calculation is then carried through to a report a yard, a superintendent or a classification society can follow and reproduce, and questions raised on it are answered by us until the review is closed.
Related analyses
Bearing reactions, slopes, lift-off and influence coefficients for the hot and cold conditions, with chock heights or offsets for installation.
Natural frequencies, order crossings, shaft stress against class limits and barred speed ranges, on a mass-elastic model of the complete train.
Axial modes against blade-rate excitation and lateral whirling with bearing coefficients from the film solution, in one rotor model.
Film thickness, edge loading, lift-off speed and comparative wear for water- and oil-lubricated stern tube bearings, straight or slope bored.
Blade geometry, offset tables and section drawings for the manufacturer, with mass and inertia for the shafting calculations.
The hull rebuilt from your drawings, with viscous resistance and the wake the propeller works in.